• Home
  • Community Feedback
  • Newsletter
  • Photo Gallery
  • Video
  • Contact us
  • Sitemap
  • Suggestions
  • About UTTIPEC
  • Minutes of Governing Body
  • Bicycle Sharing
  • Projects Approved by UTTIPEC
  • Multi Modal Integration (MMI)
  • Transit Oriented Development, TOD
  • TOD workshop series and launch
  • Standard Typical Crossing Design
  • UTTIPEC Guidelines
  • List of Empanelled Consultant, UTTIPEC
  • UTTIPEC Standard Format / TORs
  • Walkability
  • Public Notice

Hot Links

  • Engagement of Sr. Consultant (UTTIPEC) and Consultant (UTTIPEC) on contractual basis (Expired 16/07/2021 upto 6 PM.)  Engagement of Sr. Consultant (UTTIPEC) and Consultant (UTTIPEC) on contractual basis (Expired 16/07/2021 upto 6 PM.)[1.45 MB]
  • Street Design Guidelines  Street Design Guidelines[24.67 MB]
  • Street Design Checklist  Street Design Checklist[0.07 MB]
  • FOB Consideration and Design Checklist  FOB Consideration and Design Checklist[0.12 MB]
  • Guideline for Road Marking  Guideline for Road Marking[4.37 MB]
  • Pedestrian Design Guidelines  Pedestrian Design Guidelines[30.99 MB]
  • Expression of Interest" from interested Pvt./Public firms/ NGO's both national and international
  • List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
  • Advertisement for Consultant Job Positions in UTTIPEC (March 2015)  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)[0.41 MB]
  • Launch of TOD Workshop Series
  • Advertisement for Consultant Job Positions in UTTIPEC (March 2015)  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)[0.41 MB]

News Flash

  • No record found
  1. Home
  2. Approved Project

    Projects Approved By UTTIPEC

  • Project 1- Proposal of Link Road connecting Press Enclave road with Outer Ring Road
  • Project 2- Improvement of circulation around newly constructed Rotary at domestic Airport Road & Approach Road connecting Dwarka
  • Project 3- Corridor improvement plan of Rani Jhansi Road with a two level Grade Separator from Filmistan Cinema to Boulevard Road
  • Project 4- Traffic Management Plan on Roads Leading to and around New Delhi Railway Station and Civic Centre, Building at New Delhi
  • Project 5- Proposal for comprehensive development of corridor (Outer Ring Road) between Mangolpuri to Madhuban Chowk
  • Project 6- Proposal for comprehensive development of corridor (Outer Ring Road) between Madhuban Chowk to Mukarba Chowk
  • Project 7- Interim part extended plan of the fly over (under construction) on RTR – ORR intersection between Pashchimi Marg / Sangam Marg, intersection upto almost Vasent Marg intersection
  • Project 8- Elevated Corridor over Barapullah Nallah
  • Project 9- Proposal for Comprehensive Development of Corridor (on Ring Road) between Azadpur to Prembari Pul
  • Project 10-Transportation & Circulation Plan for Redevelopment of ISBT at Anand Vihar
  • Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk
  • Project 12-Proposal for comprehensive development of corridor (Outer Ring Road) between Vikas Puri to Meera Bagh
  • Project 13- ITO : Urban Renewal
  • Project-14-Transportation & Circulation Plan for Re-development of ISBT at Sarai Kale Khan
  • Project 15-Construction of RUB at level crossing adjacent to Roshnara Garden
  • Project 16-Traffic management plan of Delhi University (North campus)
  • Project 17- Comprehensive Proposal on Vikas Marg Metro connectivity & Parking Strategies.
  • Project 18- Road Development Plan for 45M ROW approach road from Mehrauli Mahipalpur and Nelson Mandela Road towards DDA Mega Housing Scheme.
  • Project 19–Detailed Alignment plan for widening of Patparganj Road from ROB-36 to NH-24.
  • Project 20- The proposal for Short Term measures for traffic circulation related to Sanjay Gandhi Transport Nagar on NH-1(Libas pur junction)
  • Project 21-Intersection Design & Widening proposal for Poorvi Marg - Outer Ring Road intersection.
  • Project 22- Improvement of ‘T’ Junction at Samalkha Chowk
  • Project 23- Traffic Circulation and Management Plan for S.P. Mukherjee Marg.
  • Project 24- Approved proposal of Traffic & Circulation Plan around the Multi-level Car Parking at Kamla Nagar
  • Project 25- Approved proposal of Improvement of corridor Development Plan of Mehrauli Mahipalpur Road from Andheria Mor to Mahipalpur (Phase-I i.e. from Andheria Mor to Aruna Asaf Ali Marg).
  • Project 26: Approved Proposal of Part Layout Plan of Integrated Passenger Terminal cum bus depot with bus terminal facility at AnandVihar, Delhi
  • Project 27- Approved proposal of Corridor Improvement Proposal (ORR-Rao Tula Ram Marg & Benito Jurez Marg) (Stage-III drawings for final recommendation & approval) Traffic Improvement Plan of ORR (From IIT Gate to NH-8 influence Area) i) Underpass
  • Project 28- Approved proposal of Karol Bagh Pedestrian Project : Parking and circulation system around the proposed Ajmal Khan Pedestrian street
  • Project 29- Approved proposal of ‘Integrated Transit Corridor Development Plan from Ashram Flyover to DND Flyover- Provision of ‘U’ turn at DND Flyover’.
  • Project 30- Approved proposal of Construction of ROBs on UER-II – DDA
  • Project 31- Approved proposal of Detailed Feasibility Study and Geometric Design for Extension of Barapullah Elevated Road Across River Yamuna from Sarai Kale Khan to Mayur Vihar (Ph-III)
  • Project 32- Approved proposal of Project of Kalindi Bypass from Noida Toll Bridge near Maharani Bagh, Delhi to Badarpur Border
  • Project 33- Approved proposal of Bicycle Sharing Services- Pilot Project, Dwarka.
  • Project 34- Approved proposal of Flyover-cum ROB on UER-I and FCI Godowns, Delhi- Karnal Railway Line and Alipur Road Junction (Narela)
  • Project 35- Approved proposal of Traffic circulation plan (of cluster buses) at Kushak Nallah Bus Depot
  • Project 36- Approved proposal of Barapullah Phase-II Project with redevelopment of Kidwai Nagar (East) Project- Improvement of alternative routes /secondary network for Barapullah Phase-II corridor
  • Project 37- Approved proposal of Redevelopment of Anand Vihar Railway Station
  • Project 38 - Approved proposal of Redevelopment of Bijwasan Railway Station
  • Project 39- Approved proposal of One way Traffic Circulation Scheme for Decongestion of ITO Junction
  • Project 40- Approved proposal of One way Traffic Circulation Plan to decongest W-Point, Tilak Marg, Mathura Road, BSZ Marg and Subhash Marg in consultation with NDMC and PWD
  • Project 41- Approved proposal of Regional Connectivity (Haryana to Delhi- Alignment of 80M R/W road from the boundary of NCT Delhi to Village Bijwasan Road extended upto UER-I-Preparation of DPR for the Link Road from Dwarka (UER-II to Delhi-Haryana Borde
  • Project 42- Approved proposal of Cycle Sharing Plan/NMT Plan for Dwarka
  • Project- 43 Integrated Transit Corridor Development and Street Network / Connectivity Plan for the corridor / influence zone – Nizammudin to Badarpur Border Section (Ashram Underpass).
  • Project-44 Corridor from RUB Shalimar Bagh to Outer Ring Road
  • Project 45 for Corridor Development Plan of Mangal Pandey Marg
  • Project-46 Integrated Transit Corridor Development and Street Network / Connectivity Plan for Najafgarh Area (Short Term proposal)(PWD,GNCTD)
  • Project-47: Extension of Ashram Flyover to DND/Ring Road
  • Project-48: Construction of Half Underpass on Outer Ring Road between Gopalpur Red Light-Jagatpur Bridge
  • Project-49: Integrated Transit Corridor Development and Street Network / Connectivity Plan. Sh.-Old Yamuna Bridge to Delhi-UP Border (Apsara Border) and flyover at Shastri Park Junction on GT Road.
  • Project-50:Feasibility of 3rd and 4th connectivity of Redevelopment of East Kidwai Nagar towards Barapullah Phase-II corridor PWD & NBCC.
  • Project-51: Integrated Transit Corridor Development and Street Network / Connectivity Plan for corridor (a) Outer Ring Road to Modi Mill flyover to IIT Gate and (b) on Ring Road from Bhairon Marg ‘T’Junction to DND Intersection.
  • Project-52:Integrated Transit Corridor development and street Network/Connectivity Plan for the corridor/influence zone along with detailed design of all intersections and mid sections joined on traffic and feasibility studies for the corridor/network around ITPO
  • Project -53-Redevelopment of Chandni Chowk Road(Red Fort to Fatehpuri Masjid)
  • Project -54-Integrated Transit Corridor Development and Street Network / Connectivity Plan for the influence zone of the corridor of Pusta Road from Shastri Park intersection to Sabhapur Border via Khajuri Khas Chowk
  • Project no. 55 -Connectivity of Flyover/ Underpass between Northern Mahipalpur bypass road and Airport Road near Hanuman Mandir .
  • Project no. 56-Improvement of three intersections on AurobindoMarg (AurobindoChowk to AndheriaMor).
  • Project No. 57- Construction of 2nd Bridge onYamuna River near KalindiKunj/ Traffic Circulation Plan on SaritaVihar side upto proposed Kalindi By-pass (6-Lane Yamunabridge near KalindiKunj Noida)
  • Project No. 58- Corridor Development and Street Network / Connectivity Plan for the corridor /network of Rohtak Road / NH-10 (Jwala Heri market red light to Jwalapuri red light); Left turn from Mangolpuri to Punjabi Bagh.’
  • Project No. 59- Elevated Corridor from Chilla Regulator (Delhi) to MP-03 road along Shahdara drain/ 6- Lane Elevated Corridor over Shahdara drain between Mayur Vihar Flyover (near Chilla Regulator) and Mahamaya Flyover in Noida
  • Project No. 60- Short-term improvement plan for decongestion of Hardev Sahai Marg and Rani Jhansi Road between Kashmere Gate and Panchkuian Marg Intersection
  • Project No. 61- Traffic Study for Development of Exhibition-cum-Convention Centre (ECC), Sector 25, Dwarka.
  • Project no.62 Implementation of Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) corridor in NCR: Traffic study and proposal for the HPL site at Jangpura (RRTS Stabling line) for road connectivity of proposed RRTS Complex at Jangpura, New Delhi
  • Project No.63 Detailed Feasibility Study and geometric design for construction of ROB/RUB on railway crossing No. LC-12 (Delhi-Ambala Line) on Khera Kalan to KheraKhurd Road
  • Project No. 64 Corridor Development and street Network/ Connectivity Plan for the influence zone of the corridor between Punjabi Bagh Flyover and Raja Garden Flyover
  • Project No. 65 Integrated Transit Corridor Development and street Network / Connectivity Plan for the corridor / influence zone along with detailed design of all intersections and mid-sections based on traffic and feasibility studies for the corridor/ network Sarai Kale Khan to IGI Airport including areas covering "Re-development of General Pool Residential Accommodation (GPRA) Colonies at Kidwai Nagar, Nauroji Nagar, Netaji Nagar, Sarojini Nagar, Mohammaddpur, Thyagraj Nagar, Kasturba Nagar & Srinivaspuri and AIIMS Trauma Centre in Delhi.
  • Project No. 66- Multi Modal Integration (MMI) Plan of Karkarduma Metro Station
  • Project 67.Multi Modal Integration (MMI) Plan of Uttam nagar Metro Station, Nawada Metro station, Janakpuri metro station
  • Project 68. Transportation plan for Development/ Redevelopment of Parliament House, Common Central Secretariat and Central Vista Avenue at New Delhi
  • Project 69. Traffic Circulation and Transport Infrastructure Plan for the proposed Redevelopment of New Delhi Railway Station
  • Project 70 –Walkability Plan for ITO Junction
  • Project 71 –Walkability Plan for Kamla Nagar
  • Project 72 –Walkability Plan for Lajpat Nagar
  • Project 73 –Walkability Plan for INA Market and Metro Station
  • Project 74 –Walkability Plan for HauzKhas - IIT
  • Project 75 –Walkability Plan for Delhi University (North Campus and South Campus)
  • Project 76 –Integrated Transit Corridor Development and street Network/ Connectivity Plan for the corridor/ influence zone along with detailed design of all intersections and mid-sections based on traffic and feasibility studies for the corridor/ network - Approach roads from Chhattarpur Road to facilitate the plot allotted to SAARC University. CAPFIMS and HUPA, NIC & Executive Club Road, etc. in villages Maidangarhi. Sayurpur, Satbari
  • Project 77 – Multi Modal Integration Plan for Inderlok Metro Station
  • Project 78 – Multi Modal Integration Plan for Chandni Chowk Metro Station
  • Project 79 – Multi Modal Integration Plan for Laxmi Nagar Metro Station
  • Project 80 – Walkability Plan for Bhikaji Cama Place
  • Project 81 – Walkability Plan for Old Delhi Railway Station
  • Project 82 – Walkability Plan for Inderlok Station Area
  • Project 83 – Walkability Plan for Laxmi Nagar
  • Project 84 – Walkability Plan for Nehru Place
  • Project 85 – Walkability Plan for Saket-Malviya Nagar
  • Project 86 – . Implementation of Master Plan of AIIMS New Delhi to convert it into world class Medical University – Approval for Traffic Impact Assessment Report for the Redevelopment of AIIMS campus.
  • Project 87 – Preparation of cycle track on the route from New Moti Bagh to South Block- North Block - Nirman Bhawan - Shanti Path - Niti Marg - Kautilya Marg - Gopi Nath Bardoloi Marg - Teen Murti Marg - Kushak Road - Rajaji Marg - K Kamraj Marg - Maulana Azad Road/Rafi Marg - Red Cross Road - Sansad Marg - GRG Road - Pandit Panth Marg
  • Project 88 – Multi Modal Integration (MMI) Plan of Jhandewalan Metro Station
  • Project 89 – Multi Modal Integration (MMI) Plan of Nangloi Metro Station
  • Project 90 – Multi Modal Integration (MMI) Plan of Rajendra Place Metro Station
  • Privacy Policy
  • Terms & Conditions
  • Disclaimer
  • Visitor: 20190

Copyright©UTTIPEC - India. All Right Reserved