DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Launch of TOD Workshop Series
»  Project 24- Approved proposal of Traffic & Circulation Plan around the Multi-level Car Parking at Kamla Nagar
»  New Project 31 for Approval - Proposal for Widening and upgradation of Mandi Road(MG Road to Delhi Haryana Border)in NCT of Delhi.
»  Project 17- Comprehensive Proposal on Vikas Marg Metro connectivity & Parking Strategies.
»  Project 21-Intersection Design & Widening proposal for Poorvi Marg - Outer Ring Road intersection.
»  Project 22- Improvement of ‘T’ Junction at Samalkha Chowk
»  Project 23- Traffic Circulation and Management Plan for S.P. Mukherjee Marg.
»  MINUTES OF THE 38TH MEETING OF UTTIPEC GOVERNING BODY HELD ON 26.07.2012
»  Traffic Circulation Plan Kushak Nallah depot GNCTD
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants, UTTIPEC.
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 17- Comprehensive Proposal on Vikas Marg Metro connectivity & Parking Strategies.

1

Name of project

Comprehensive Proposal on Vikas Marg  Metro connectivity & Parking  Strategies

2.

Name of Agency

 DDA, UTTIPEC, PWD, Govt. of NCT  Delhi & EDMC

 

3

 

UTTIPEC Processing

Background:

The proposal of Corridor Improvement Plan of ITO Chungi to Karkari Mor was approved in-principle by the 26th Governing Body in its meeting held on 29.10.10 with the direction that PWD to take up the project and prepare the DPR based on the above proposal. However, PWD is yet to engage a consultant for the BRT corridor.

                        

        Meanwhile, Special Task Force under the Chief Secretary, Delhi on dated 25.6.2012 had desired that UTTIPEC will finalize the earlier plan with the proposal of long term  / short term parking on Vikas Marg.  Accordingly, UTTIPEC has prepared a proposal in consultation with all the Stakeholders and presented in the Working Group II-B  meeting on 5.7.12 and subsequently, same was considered in the 38th Governing Body in its meeting held on 26.7.12

 

Decision of 38th Governing Body meeting held on 26.7.12

     The Governing Body approved in principle the above proposal as per the recommendation of the Working Group with a certain directions(Minutes of 38th Governing Body meeting) ( hyperlink)

 

5.

Copy of proposal

i).  Presentation

ii). Plan                          

 

6

File No.

F6 (133)2010/UTTIPEC

 

7.

Date of uploading on website

5.10.2012

 

8.

 For additional details Contact

UTTIPEC

 

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved