DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants, UTTIPEC.
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 11- Proposal for comprehensive development of corridor ( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk

1

Name of the Project

Proposal for comprehensive development of corridor
( NH- I /Road – No:50) between Mukarba Chowk to Wazirabad Chowk

 

2

Name of the Agency

PWD, Govt of NCT,Delhi

 

3.

Consultants:           

Craphts Consultants(I) Pvt. Ltd.,

14/3, Mathura Road, Faridabad

Ph. 95129-2278813, 2275948

 

4

Project Scheduled

  1. Likely to be started by December 2010.
  2. Likely to be completed by June, 2013.

 

5

UTTIPEC Processing

a.    The project of PWD was considered by UTTIPEC Working Group IIB in its meeting dt.19.02.09. and the proposal was recommended for consideration & approval by the UTTIPEC Governing Body with the following decisions / observations :-

       i.        The proposed network as per the zonal development plan of zone P-II including 45 mt. R/W road along Bhaksawa Lake be integrated with the ORR proposal. The existing bridge on the supplementary drain may be widened together with a direct link of the 45 meter road from Zone P-II to ORR.

        ii.      Two right turning loops have been shown at Mukundpur junction. The right turning towards Wazirabad shall join the summit of the flyover and the loop for right turning from ORR shall start at the foot of the same flyover. The two traffic streams shall weave on the flyover slope and cause congestion. This may be re-examined.

       iii.      A flyover with surface level rotary has been proposed at Burari chowk junction. Integration of the next 45 meter road from Zone P-II be ensured by proper junction and  a bridge over the supplementary drain.

      iv.      The feasibility of the proposed 30 meter road along the Bhalsawa lake and golf course may be checked.  The supplementary drain should be cleaned and landscaped which will become an important feature of road network.

       v.      The intersection at Mukarba Chowk should take into account the proposal of Zonal Plan of Zone P-1(Narela) with respect to the  proposed road along the Rly. Line.

   Observations / suggestions:

       i.        As far as possible the continuity of interference–free footpaths and cycle tracks at intersections be shown.

        ii.      Traffic management plan/circulation plan for an area of around 1 km. along the both sides of ORR be prepared. Free left turn may be avoided at the intersections, even in case of signalized crossing.

       iii.      Slip roads and service roads wherever feasible, may be provided

      iv.      Width of service road, including footpath, may be at least 7.5 meters.

       v.      Provisions for segregated lanes and facilities for public transport system, including bus shops, be ensured.

      vi.      Traffic signals be shown at all intersections with provision for separate signal phase for cars, buses, NMT. Signal timings be calculated as per the traffic projections.

     vii.      Location of signage be shown in the plans.

    viii.      The details of effected structures and  trees /bushes be given in the feasibility format.

      ix.      Right of Way line of all roads as per the Master Plan / Zonal Development Plan  be shown in the plan.

       x.      A traffic management plan and a work zone Management plan during the construction period be prepared.

      xi.      Width of the flyover / elevated road on outer ring road to be maintained as per the existing under pass on Maduban Chowk

 

b.    UTTIPEC Governing body in its meeting held on 20.2.09 under the chairmanship of Hon'ble L.G, Delhi  accorded its  approval, based on the recommendation and observation/concern of the working group meeting  with following additional observations:-

      I.        The project must also include cleaning and landscaping of supplementary drain, as this being an important feature of the project.

       II.      Intersection of Mukarba Chowk should take into account, the proposal of Zonal plan (Zone – P-I Narela) specially the road along railway line.

     III.      Traffic management/ Work zone management plan during construction be prepared in consultation with Traffic Police for the influence area of about 1 k.m on either side of road .

 

6

Location Map :       

 

 

7.

Copy of the approved plan:

LAYOUT PLAN FINAL-Layout0 

LAYOUT PLAN FINAL-Layout1

LAYOUT PLAN FINAL-Layout2 

LAYOUT PLAN FINAL-Layout3 

LAYOUT PLAN FINAL-Layout4

LAYOUT PLAN FINAL-Layout5

LAYOUT PLAN FINAL-Layout6 

LAYOUT PLAN FINAL-Layout7 

LAYOUT PLAN FINAL-Layout8

 

6

For additional details

kindly contact Project Manager
(Flyover project-circle F-13), PWD,
Mukarba Chowk, Delhi

Ph: 27691871, Mob: 9818180952.

 

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved