DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Launch of TOD Workshop Series
»  Project 24- Approved proposal of Traffic & Circulation Plan around the Multi-level Car Parking at Kamla Nagar
»  New Project 31 for Approval - Proposal for Widening and upgradation of Mandi Road(MG Road to Delhi Haryana Border)in NCT of Delhi.
»  Project 17- Comprehensive Proposal on Vikas Marg Metro connectivity & Parking Strategies.
»  Project 21-Intersection Design & Widening proposal for Poorvi Marg - Outer Ring Road intersection.
»  Project 22- Improvement of ‘T’ Junction at Samalkha Chowk
»  Project 23- Traffic Circulation and Management Plan for S.P. Mukherjee Marg.
»  MINUTES OF THE 38TH MEETING OF UTTIPEC GOVERNING BODY HELD ON 26.07.2012
»  Traffic Circulation Plan Kushak Nallah depot GNCTD
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants, UTTIPEC.
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 1- Proposal of Link Road connecting Press Enclave road with Outer Ring Road

1

Name of the Project

Proposal of Link Road connecting Press Enclave road with Outer Ring Road

2

Name of the Agency

Delhi Integrated Multi-Modal Transit System Limited (DIMTS), Government of Delhi

3

Consultants

Craphts Consultants (I) Pvt. Ltd.
14/3, Mathura Road, Faridabad
Ph. 95129-2278813, 2275948

4

Project Scheduled

a)     Likely to be started by March, 2009

b)     Likely to be completed by June, 2010

5

UTTIPEC Processing

The project of DIMTS was considered by UTTIPEC Working Group II-B in its meeting dt. 20.11.08

Working Group recommended the project for approval with following concerns/observations.

v      The traffic speed, as expected to be 40 Km./h, on the interference-free down ramp may not be correct, especially during lean period.

v     The weaving length of 150 meters may cause congestion during the peak hour on Outer ring road and may create unsafe conditions during the lean period.

v      At the point of merger of ramp loop with the outer ring road the available carriage way space of 10mts may not be adequate to accommodate through traffic comprising of public transport, personalized vehicles and non motorized vehicles.

v     The proposed new link road is likely to have additional induced traffic which has not been accounted for in traffic projections.

v     The proposed link road including the  ramp loop may attract public opinion  due to shift in function of the existing internal colony road to local area link.

v     DIMTS shall interact with the local residents to convince them about the benefits of the proposal before implementing the project.

v     All road geometrics and engineering design parameters are to be ensured by DIMTS as per norms.

UTTIPEC Governing Body in its meeting held on 21.11.08 under the Chairmanship of Hon'ble L.G, Delhi accorded its approval in principle, based on the recommendation and observation/concern of the Working Group meeting.

6

 Location Map

 

7

Copy of the approved plan

 

8

Issue under process

 

9

For additional details

Kindly Contact: 
D.G.M.(Engineering), DIMTS
2nd Floor, ISBT, Kashmere Gate
Delhi-110006
Ph. No. 43090100

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved