DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Launch of TOD Workshop Series
»  Project 24- Approved proposal of Traffic & Circulation Plan around the Multi-level Car Parking at Kamla Nagar
»  New Project 31 for Approval - Proposal for Widening and upgradation of Mandi Road(MG Road to Delhi Haryana Border)in NCT of Delhi.
»  Project 17- Comprehensive Proposal on Vikas Marg Metro connectivity & Parking Strategies.
»  Project 21-Intersection Design & Widening proposal for Poorvi Marg - Outer Ring Road intersection.
»  Project 22- Improvement of ‘T’ Junction at Samalkha Chowk
»  Project 23- Traffic Circulation and Management Plan for S.P. Mukherjee Marg.
»  MINUTES OF THE 38TH MEETING OF UTTIPEC GOVERNING BODY HELD ON 26.07.2012
»  Traffic Circulation Plan Kushak Nallah depot GNCTD
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants, UTTIPEC.
»  Format for Proposal Submission
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 7- Interim part extended plan of the fly over (under construction) on RTR – ORR intersection between Pashchimi Marg / Sangam Marg, intersection upto almost Vasent Marg intersection

1

Name of the Project

Interim part extended plan of the fly over (under construction) on RTR – ORR intersection between Pashchimi Marg/Sangam Marg, intersection upto almost Vasant Marg intersection.

2

Name of the Agency

Public Works Department, Delhi.

3

Consultants

 

4

Project Scheduled

To be completed by July, 2010.

5

UTTIPEC Processing

The modifications proposed by PWD in the project earlier approved by the Technical Committee dt. 3.5.06 was considered by UTTIPEC Working Group II-B meeting dt. 16.3.2009. Working Group recommended following improvements:-

  • "The fly-over under construction under RTR-ORR to be extended above the Pashchimi Marg-Sangam Marg intersections by keeping the same clearance level as at RTR-ORR intersection. This will provide direct entry to Pashchimi Marg & Sangam Marg for the large no. of buses, pedestrians, NMT etc. possibility to ease traffic congestion from RTR Marg towards NH-8 may be examined by proper widening of surface /elevated roads in this segment.

  • The rock below Malai Mandir, which is part of the right of way, may be considered, if required, to be chiseled/removed for providing continuity of service Road & space at surface level for interference free segregated movement.

  • The provision of pedestrian paths & underpases may be ensured.

  • Whisper concrete/Rubberised material & other planning measures be used to help reduce the noise.

  • Traffic Management Plan & Work Zone Management Plans to ease the traffic flow may be worked out/imposed.

  • The other road geometric improvements & traffic management measures discussed in the meeting specifically on RTR- ORR & BJM – ORR junctions and provision of pedestrian, bicyclist facilities in the entire corridor be also appropriately incorporated.

  • PWD to accordingly modify and submit the plans for considerations of the UTTIPEC Governing body on 20.3.09."

UTTIPEC Governing Body under the Chairmanship of LG, Delhi in its meeting dt. 20.3.2009 approved the improvement plan. The decision is reproduced below:-

"Project Engineer, PWD made the presentation of improvements in the proposed corridor, as recommended by WG II-B in its meeting on 16.3.09(as given in Annexure ’F’). Sh. Kailash Vasdev & Sh. Sudhir Vohra highlighted the views of various RWAs. After hearing the views of Traffic Police, Chairman-NDMC,E.M. DDA & others, the Governing Body approved the improvement plan together with the observations of WG-IIB. The Governing Body specifically desired Project Engineer to ensure provision of adequate pedestrian facilities, continuity of proper service roads and interference free movement of local traffic. He was also directed to examine the feasibility of using the space below the flyover to the maximum extent. Project Engineer, PWD was asked to submit the integrated modified proposal to UTTIPEC for release & for uploading on UTTIPEC web-site."

The interim plan for extending the fly-over (under construction on RTR-ORR) above the Pashchimi Marg/Sangam Marg intersection by keeping the same clearance level as at RTR-ORR intersection as per the approval given by the Governing Body to be taken up by the PWD subject to the condition that the integrated plan for the entire Outer Ring Road corridor from IIT gate to NH-8/B.J. Marg to be submitted separately by PWD as per the above observation/recommendation of WG II-B (Para 5(a) and UTTIPEC Governing Body decision.(Para 5(b).

6

Location Map

 

7

Copy of the approved plan

 

8

Issue under process

The rock below Malai Mandir to be chiselled/removed in consultation with various stakeholders and experts.

9

For additional details

Sh. Umesh Mishra
Circle- F-11, Flyover Project PWD GNCTD, Bhai Nihal Singh Marg, Lajpat Nagar-IV
New Delhi-110024.
Tel. Off. :011-26227903, 26441871
Fax No.: 26225999
e-mail ID – pm_f11@yahoo.co.on