»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project-46 Integrated Transit Corridor Development and Street Network / Connectivity Plan for Najafgarh Area (Short Term proposal)(PWD,GNCTD)

1.        

Name of Project

Integrated Transit Corridor Development and Street Network / Connectivity Plan for Najafgarh Area (Short Term proposal)(PWD,GNCTD)

2.        

Name of the Agency

PWD

 

3.        

Consultant

Craft Consultants (I) Pvt. Ltd.

 

4.        

Copy of Proposal /Presentation

Short term proposal

5.        

UTTPEC Processing

The project was discussed in 60th  UTTIPEC Working Group-II-B meeting under the Chairmanship of Secretary, PWD on 02.12.2016.  The background, project, details, observations, recommendations of Working Group-II-B meeting are as follows:

  

Observations:

 

i.      Representatives of Delhi Traffic Police mentioned that presently one way circulation on the Phirni road around Najafgarh area is being implemented in which the central verge are not removed.

 

ii.    Traffic signages as per IRC code to be  planned  in the proposal.

 

Recommendation:

 

       Working Group suggested that if expansion of RoW is not possible, creation of separate dedicated spaces for MT, NMT and pedestrian will be akin to BRT experiment and worsen the traffic condition.  In such situation, Working Group suggested that PWD should work out a practically feasible solution which provides walking path for pedestrians, removes median in case of one way traffic etc. in improving traffic flow.  Such situation be shared with public through website of UTTIPEC and also public representatives, stakeholders for feedback.

 

Decision of 54th  Governing Body dated 22.06.2017:

 

         The proposal was approved.

 

6.        

Date of Uploading the project

 15.11.2017

 

7.        

Additional Details

Executive  Engineer, Flyover Division, F-51, PWD, Bhairon Marg T-Junction,Near Pragati Power Station,  Delhi-110002

Phone no. 011-23378254 Fax No.: 23379693

Email id – eepwddelhif51@gmail.com  

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved