DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation


Project 31- Approved proposal of Detailed Feasibility Study and Geometric Design for Extension of Barapullah Elevated Road Across River Yamuna from Sarai Kale Khan to Mayur Vihar (Ph-III)

(1)

Name of Project

Detailed Feasibility Study and Geometric Design for Extension of Barapullah Elevated Road Across River Yamuna from Sarai Kale Khan to Mayur Vihar (Ph-III).

(2)

Name of the Agency

PWD

(3)

UTTPEC Processing

The proposal was discussed in 44th Governing Body meeting of the UTTIPEC was held on 22.8.13 under the Chairmanship of the Hon’ble L.G. of Delhi in which the Governing Body approved in principle the proposal “Detailed Feasibility Study and Geometric Design for Extension of Barapullah Elevated Road Across River Yamuna from Sarai Kale Khan to Mayur Vihar (Ph-III).

 

Decision of the Governing Body:

 After due deliberation, the conceptual proposal, including one loop for right turning traffic from Mayur Vihar towards Akshardham was approved by the Governing Body.

         It was proposed to upload the proposal on UTTIPEC website under community feedback for comments on 2nd loop for right turning traffic to Mayur Vihar from Noida.  If the same was favoured by the responses from people, it may also be taken up for construction.

(4)

Copy of approved plan/presentation

Click here 

Copy of Approved Plan

(5)

File No.

 

F.5 (40)2012/UTTIPEC

(6)

Date of uploading of website

 06.08.2015 

(7)

Additional Details

Executive Engineer, PWD

Flyover Project Division, F-123

Ramesh Park, Near Shakarpur Pulice Station

Delhi-110022

Ph.No:- 011-22056485

Email Id:- f123ee@gmail.com

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved