DDA
Home   |   Photo Gallery   |   Suggestions   |   Newsletter   |   Sitemap   |   Contact us
Navigation Navigation Navigation
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Advertisement for Consultant Job Positions in UTTIPEC (March 2015)
»  Launch of TOD Workshop Series
»  Expression of Interest” from interested Pvt./Public firms/ NGO’s both national and international,
»  Street Design Guidelines
»  Street Design Checklist
»  FOB Consideration and Design Checklist
»  List of Empanelled Consultants / Firms / Agencies of UTTIPEC.
»  UTTIPEC Standard Format / TORs
»  Guideline for Road Marking
»  Pedestrian Design Guidelines
»  Transit Oriented Development (TOD)
Navigation Navigation Navigation
Navigation Navigation Navigation
»  Focus on public transport Govt. Body issue guidelines for seamless travel.
»  New Articles from AAUI Dated 24.01.2011
»  Lecture Organized by UTTIPEC at IIC dated 13.01.2011
»  PRESENTAION MADE ON 13.01.2011 AT IIC DURING THE LECTURE ORGANIZED BY UTTIPEC
»  Crackdown on illegal parking
»  Grand plan: Integrate all transport in Delhi, NCR
»  Gazette Notification dated 07.08.2009
Navigation Navigation Navigation
Projects

Working Group

Projects Approved by UTTIPEC

Projects for Seeking Community Feedback



TOD
TASK FORCE

Integrated Plan for Connectivity Improvement to Vikas Marg

Scope of Work for Detailed Design of Karkarduma TOD Pilot Site

Conceptual Plan for Karkarduma TOD Pilot Site

Scope of Work for NCT-NCR Alternate Growth Scenarios through Integrated Landuse-Transport Modelling

Redevelopment Plan of Kidwai Nagar (East) for General Pool Residential Accommodation

WG IA

ITO Connectivity Improvement Urban Renewal and Project

Storm Water Management Guidelines (SWM)-Retrofitting of Urban Drainage GNCTD 

Cycle Feeder Service Proposal

-

WG IIA

Uniform cross-section for UER-I, II & III

JUNCTION DETAIL PLAN

PHASE -I CROSS SECTION OF UER - 80 M ROW

PHASE -I CROSS SECTION OF UER - 100 M ROW

Traffic Circulation Plan Kushak Nallah depot GNCTD 

Road Cross Sections with underground services

-

WG IIIA

-

-

WG IIIB

Approval Terms of Reference (TOR) for carrying out Feasibility Study for ITC Corridors in Phase III

ITC/BRT Corridor - Karawal Nagar to Chilla and Gokulpuri to Mori Gate.

 

Project 19-Intersection Design & Widening proposal for Poorvi Marg - Outer Ring Road intersection. 

 

Project 20- Improvement of 'T' Junction at Samalkha Chowk

 

Project 21- Traffic Circulation and Management Plan for S.P. Mukherjee Marg.

 

Project 22- Approved proposal of Traffic & Circulation Plan around the Multi-level Car Parking at Kamla Nagar

Community Feedback

Projects Approved by UTTIPEC

Back
Privacy Policy  |  Disclaimer  |  Terms & Conditions

Designed & Developed by NIC/NICSI, Copyright©UTTIPEC - India. All Right Reserved